CURRENT HYDRO | PROJECT PORTFOLIO

Emmett Sanders
Hydroelectric Project

20.8 MW

PLANNED CAPACITY


Arkansas River

WATERWAY

P-15330

FERC PROJECT NO.


Jefferson County

ARKANSAS


PROJECT OVERVIEW

New power from existing infrastructure

The Emmett Sanders Hydroelectric Project will add 20.8 MW of new hydropower generation at the existing U.S. Army Corps of Engineers Emmett Sanders Lock and Dam (No. 4) on the Arkansas River. By putting existing federal infrastructure to work, the project is expected to generate approximately 96,000 MWh of reliable, renewable electricity annually, enough to power approximately 9,200 homes, without constructing a new dam or reservoir. The U.S. Army Corps of Engineers will continue to operate the existing lock and dam.

The Notice of Intent to File an Application, Pre-Application Document, and Proposed Study Plan were filed with the Federal Energy Regulatory Commission (FERC) in April 2026 under FERC Project No. 15330.

PROJECT NUMBER
P-15330

TURBINE-GENERATOR
3 Pit Turbines

PLANNED ANNUAL GENERATION
96,000 MWh

START OF CONSTRUCTION
Estimated 2031

COMMERCIAL OPERATION
Estimated 2034

PROJECT VISUALS

Proposed Project Configuration

Project Rendering

Illustrative view of the proposed development and its relationship to the existing facility

Proposed Site Layout

Site arrangement showing the proposed project area

WHY IT MATTERS

Benefits for the region

Reliable Renewable Power

Planned generation that contributes carbon-free electricity to the regional grid.

Economic Opportunity

Construction employment, local business activity, and potential long-term economic contributions.

Existing Infrastructure

Developing power at a longstanding federal lock and dam, without construction a new dam.

PUBLIC INFORMATION

Documents & public meetings