Allegheny 3
Hydroelectric Project

9.7 MW

PLANNED CAPACITY


Ohio River

WATERWAY

P-15262

FERC PROJECT NO.


Belmont County

PENNSYLVANIA


PROJECT OVERVIEW

New power from existing infrastructure

The Allegheny 3 Hydroelectric Project will add 9.7 MW of new hydropower generation at the existing U.S. Army Corps of Engineers C.W. Bill Young Lock and Dam on the Allegheny River. By putting existing federal infrastructure to work, the project is expected to generate approximately 65,400 MWh of reliable, renewable electricity annually, enough to power approximately 6,200 homes, without constructing a new dam or reservoir. The U.S. Army Corps of Engineers will continue to operate the existing lock and dam.

The Pre-Application Document and Proposed Study Plan were filed with the Federal Energy Regulatory Commission (FERC) in October 2024 under FERC Project No. 15262.

PROJECT NUMBER
P-15262

TURBINE-GENERATOR
5 Pit Turbines

PLANNED ANNUAL GENERATION
65,400 MWh

START OF CONSTRUCTION
Estimated 2030

COMMERCIAL OPERATION
Estimated 2033

PROJECT VISUALS

Proposed Project Configuration

Project Rendering

Illustrative view of the proposed development and its relationship to the existing facility

 

Proposed Site Layout

Site arrangement showing the proposed project area

WHY IT MATTERS

Benefits for the region

Reliable Renewable Power

Planned generation that contributes carbon-free electricity to the regional grid.

Economic Opportunity

Construction employment, local business activity, and potential long-term economic contributions.

Existing Infrastructure

Developing power at a longstanding federal lock and dam, without construction a new dam.